Installation of the panels.
Here we have the ongoing process of the panel installing. I am starting with the LH first. The RH side requires some major fibreglassing mods on the cockpit itself.
LHS panels in correct positions.
Another shot of LHS panels in position. Also visable is the cutting and refibreglassing of the original raised panel mount on the cockpit (still to be painted).
Full LH side view of panels.
The installation has begun. Here the Landing Gear panel and Speed Brake indicator are fitted. You will also notice that the Landing Gear Lever is now in position.